Estimating Manager for Life Sciences & Data Centre Construction
見る: 161
更新日: 01-06-2024
場所: Mississauga Ontario
カテゴリー: 製薬/化学/バイオテクノロジー
業界:
ジョブタイプ: Full-time
仕事内容
EllisDon is committed to being the safest general contractor. As part of our vaccine directive, we require employees to be fully vaccinated, or in the process of receiving the vaccine against COVID-19. Should you have any additional questions related to our vaccine directive as you move forward in the hiring process, please discuss this with our People & Culture team.
Connect with usLinkedIn,Instagram,Facebook,Twitter
Thinking about a change?
We recognize that the construction industry is changing at a rapid pace and we continually strive to be at the forefront. Our core values empower people to deliver great careers to one another and develop creative solutions for complex problems on some of the most exciting projects. It doesn’t matter what your expertise and craft is – there are no boundaries. We are a group of professionals with a variety of expertise within pre-construction, construction, and post-construction. To learn more, check out our Cradle to Grave services and hear from our team directly about what a career at EllisDon could look like for you. As you can see, we are a diverse bunch.
Above all, we are a group of individuals with unique experiences and at EllisDon, we choose to celebrate the strength in our differences, every day. EllisDon’s commitment to Inclusive Diversity is to work together to create an environment where every employee feels safe to be their true and authentic self. Ultimately, EllisDon’s purpose is to provide people with similar values the opportunity to achieve their full potential; to deliver that opportunity for great careers to one another; and to contribute meaningfully to the community we share with others.
In case you’re curious, here’s what the industry thinks of us and some of the impacts we’ve made to the communities we work in
More about Life Sciences & Technology
EllisDon carved out a new national construction group in 2021 with a focus on the construction of technical buildings such as Laboratories, Pharmaceutical Manufacturing facilities and Data Centers. We have completed over $2.5B in Data Centre projects and $16B in Life Sciences and Pharmaceutical buildings, we are strategically focused on the increased activity in these technical buildings post pandemic. Within a year of inception, we have a successful backlog of over $500M and have secured projects across Canada.
This is an incredible opportunity to be the Estimating Manager for this new national construction group at EllisDon.
You as an Estimating Manager, Life Sciences & Technology:
- You will be responsible for all estimating functions related to the Life Sciences and Technology group at EllisDon. This will involve pre-construction estimate preparation, budget and guaranteed maximum price submissions as well as design build and stipulated price estimate submissions.
- You will work closely with our mechanical and electrical estimating team as well as our operations, pre-construction, and engineering teams to prepare accurate conceptual estimates.
- You will build and develop cost metrics for all technical building types.
- You will work closely with the SVP / Area Manager for the Life Sciences and Technology group to successfully manage risk and EllisDon’s growth strategy for this group.
- Effectively determine the bid strategies required for the company to be successful as well as plan and coordinate and supervise large projects.
- Review all final estimate packages to ensure accuracy and completeness, prior to formal quotation.
Is this the right role for you?
- Engineering degree or equivalent combinations of technical training and/or related experience. Advanced management or technical training preferred.
- 15 plus years’ of experience in similar technical facility (data centers pharmaceutical manufacturing and laboratories; center) estimating and related functions plus thorough knowledge of corporate objectives impacting estimating, estimating strategies and techniques, and construction contracts required.
- Excellent organizational, supervisory and decision making/problem solving skills essential.
EllisDon is proud to provide this unique career opportunity within a progressive environment with continuous learning and opportunity for growth, as well as a competitive compensation package.
Go ahead and be yourself. We’ll pay you for it!
We are an equal opportunity employer. While only qualified candidates will be contacted for an interview, be sure to continually check our website for other related positions as they are posted.
Accommodation for Applicants will be made during the recruitment process when requested.
Apply today atwww.ellisdon.com(or Share onLinkedIn,Facebook)
締切: 16-07-2024
無料の候補者に適用するにはクリックしてください
レポートジョブ
同じ仕事
-
💸 $120,000–$125,000 a year⏰ 28-06-2024🌏 Mississauga, Ontario
-
⏰ 23-07-2024🌏 Mississauga, Ontario
-
⏰ 06-07-2024🌏 Mississauga, Ontario
-
⏰ 26-06-2024🌏 Toronto, Ontario
-
⏰ 06-07-2024🌏 Brampton, Ontario
-
⏰ 19-06-2024🌏 Mississauga, Ontario
-
⏰ 01-07-2024🌏 Mississauga, Ontario
-
⏰ 08-07-2024🌏 Mississauga, Ontario
-
⏰ 02-07-2024🌏 Barrie, Ontario
-
⏰ 06-07-2024🌏 Ottawa, Ontario